"The design and works on site were highly professional.  We highly recommend him to everyone looking for support on their land for a regenerative project"

Gabrielle Plesse, owner of the property

The property

​

The client reached out after a devastating fire burnt their land entirely. The vegetation was completely gone, and with every rain the soil was swept away leaving huge erosion channels behind. 

​

Design goals

​

The main goals for this design were:

​

- To promptly develop emergency solutions to stop the erosion and help the land recover

- To design water features that could hydrate the landscape while also prevent potential future fires

- To integrate agroforestry systems and vegetation in the design of the earthworks

- To provide the client with a masterplan with all the potential water features that they could implement in the upcoming years

​

20231213_101336.jpg

Digital map developed by Nick Steiner

The earthworks

​

This particular project was very implementation heavy, and a lot of the features designed digitally had to be re-evaluated and adjusted once on the fields. 

​

In around 5 days of work, we measured the site, prepared it and implemented the following features:

​

- A dam in one of the most critical areas of the land in terms of erosion

- One tilted terrace that collected water from the road and infiltrated it onto the closest ridge

- A sediment trap that filtered any sediment coming from the road

- A swale that collected water on the lowest point of the system

- Appropriate rock-lined spillways for all of the above features

​

Screenshot 2026-08-29 at 17.01.20.png
Screenshot 2026-08-29 at 17.01.53.png